Thursday, November 28, 2013
Bricks and Bathrooms
Popped past the house tonight. Brick work is going well. Spa and bath frames are now in, as well as the shower bases. Cavity door frames have been put in and one door delivered. Very pleased with the job the brickies are doing.
Tuesday, November 26, 2013
Bricks
Two days of brick work! We're very happy with the "brickmanship" (lol - is that a word??)
The bricks look really good with the window frame colour. It's good to see how the colours are coming together. We did good!
The bricks look really good with the window frame colour. It's good to see how the colours are coming together. We did good!
Bricks: Boral Rouge
Windows: White Birch
Roof, gutters and facia: Woodland Grey
Thursday, November 21, 2013
A Clean House
Wednesday, November 20, 2013
Rapt with the wrapping and the roof
We heard from our site supervisor today. He told us that the roof was going on today and that bricks will be delivered on Monday. Lock up should be the 6th of December. Wahoo!
So of course I couldn't resist popping past to check out the roof. The house has been wrapped with the sarking and most of the roof is on. It looks sooooo good!
Tuesday, November 19, 2013
Guttered
LOL! Guttering is on and pipes - hot water, cold water and gas pipes are in.
Just not sure what is happening with the frame at the back of the garage. Our plans have a single door (we forgot to put in a window) but the door frame has not been put in and there's a window sitting in the garage along with the door frame - both of which would fit in the gap in the frame (btw - we have the frame invoice even though in our opinion it's not finished yet)
We emailed our BC to ask about the window - wondered if their plans were wrong, and if so, we are more than happy for them to put in the window. She stated that "Your house will be built as per the plans, any material on site is required for areas specified on the plans. We are unable to accommodate any structural changes at this stage of the construction process." so we are wondering where the heck that window will be going and why on earth was it delivered if it was "specified on the plans"?
So we are waiting to hear from our site supervisor to find out what is going on, and if they can just be done with and put the window in.
Just not sure what is happening with the frame at the back of the garage. Our plans have a single door (we forgot to put in a window) but the door frame has not been put in and there's a window sitting in the garage along with the door frame - both of which would fit in the gap in the frame (btw - we have the frame invoice even though in our opinion it's not finished yet)
We emailed our BC to ask about the window - wondered if their plans were wrong, and if so, we are more than happy for them to put in the window. She stated that "Your house will be built as per the plans, any material on site is required for areas specified on the plans. We are unable to accommodate any structural changes at this stage of the construction process." so we are wondering where the heck that window will be going and why on earth was it delivered if it was "specified on the plans"?
So we are waiting to hear from our site supervisor to find out what is going on, and if they can just be done with and put the window in.
![]() |
| Big space for single door |
![]() |
| Garage door is on the right side |
![]() |
| Door frame leaning in the mud room |
![]() |
| Small random orphan window |