Tuesday, November 19, 2013

Guttered

LOL! Guttering is on and pipes - hot water, cold water and gas pipes are in.








Just not sure what is happening with the frame at the back of the garage. Our plans have a single door (we forgot to put in a window) but the door frame has not been put in and there's a window sitting in the garage along with the door frame - both of which would fit in the gap in the frame (btw - we have the frame invoice even though in our opinion it's not finished yet)

We emailed our BC to ask about the window - wondered if their plans were wrong, and if so, we are more than happy for them to put in the window. She stated that "Your house will be built as per the plans, any material on site is required for areas specified on the plans. We are unable to accommodate any structural changes at this stage of the construction process." so we are wondering where the heck that window will be going and why on earth was it delivered if it was "specified on the plans"?

So we are waiting to hear from our site supervisor to find out what is going on, and if they can just be done with and put the window in.


Big space for single door

Garage door is on the right side



Door frame leaning in the mud room

Small random orphan window



No comments:

Post a Comment